Sign In | Join Free | My portofva.com |
|
Brand Name : Yuhong
Model Number : ASTM B111 C70600
Place of Origin : China
Certification : ABS, GL, DNV, NK, PED, AD2000, GOST9941-81, CCS, ISO 9001-2015
Price : Negotiable
Packaging Details : Ply-Wooden Case /Iron Case/ Bundle with Plastic Cap
Delivery Time : 5 - 90 Work Days
Payment Terms : T/T, L/C
Standard : ASTM B111
Application : Heat Exchager / Condenser
NDT : HT, ECT
Material : Copper Alloy
Length : As Per Customer's Request
Shape : Tube
Copper alloy tube is a kind of boiler tube which is made of copper alloy material and produced through hot rolling and cold drawing processes. It is suitable for heat exchanger and condenser in various industries. It also can be used for many other purposes.
The copper alloy tube we offer is seamless and its surface is smooth. It is produced according to the ASTM B111 standard and can be customized to different sizes and shapes. It can be manufactured in any length as per the customer's request. The non-destructive testing methods we offer include HT and ECT.
This kind of copper alloy tube features excellent heat transfer performance and durability, which makes it widely used in various industries like boiler, heat exchanger and condenser. The copper alloy tube also features high corrosion resistance, high tensile strength, and good wear resistance, which makes it suitable for various applications. It is an economical solution with great cost performance.
Parameter | Description |
---|---|
Application | Heat Exchager / Condenser |
NDT | HT, ECT |
Shape | Tube |
Material | Copper Alloy C70600 |
Length | As Per Customer's Request |
Standard | ASTM B111 |
Yuhong, a trusted brand with ASTM B111 C70600 seamless tube, offers quality Copper Alloy tubes for heat exchanger and condenser applications. These tubes come with superior material quality, NDT testing, and are certified by ABS, GL, DNV, NK, PED, AD2000, GOST9941-81, CCS, and ISO 9001-2015. The length of the tubes can be customized as per the customer's request. The tubes are packaged in Ply-Wooden Case /Iron Case/ Bundle with Plastic Cap and are available at negotiable prices. Delivery time for these tubes is 5-90 workdays. Payment terms are T/T, L/C.
Copper Alloy Tube Technical Support and Service:
![]() |
ASTM B111 Copper Alloy Tube for Heat Exchager/Condenser Images |